Energy Division

”Creative New Values in Life and Dreaming of a Better Future for our Customers”
  • 이미지
    Representative Project
    Jangmoon Turn-key project
    Division Client Construction period Country/Location Construction Overview
    HRSG Turn-key SIEMENS Energy Solution, Korea / SK E&S 2014 KOREA / 경기도 파주시 <div><img alt="" src="/backoffice/images/editor/db91fb03-8c5c-4e53-a14c-ff9ebefd20cb190618_00000000.jpg" style="height:383px; width:600px" /></div>
    • Division
      HRSG Turn-key
      Client
      SIEMENS Energy Solution, Korea / SK E&S
    • Construction period
      2014
      Country/Location
      KOREA / 경기도 파주시
    • Construction Overview
      <div><img alt="" src="/backoffice/images/editor/db91fb03-8c5c-4e53-a14c-ff9ebefd20cb190618_00000000.jpg" style="height:383px; width:600px" /></div>
  • 이미지
    Representative Project
    Dangjin #5 Turn-key project
    Division Client Construction period Country/Location Construction Overview
    HRSG Turn-key SIEMENS AKTIENGESELLSCHAFT, GERMANY / GS EPS 2014 KOREA / 충청남도 당진시 <div><img alt="" src="/backoffice/images/editor/fad28866-c97b-4240-83d9-07a6712f2016190618_00000000.jpg" style="height:383px; width:600px" /></div>
    • Division
      HRSG Turn-key
      Client
      SIEMENS AKTIENGESELLSCHAFT, GERMANY / GS EPS
    • Construction period
      2014
      Country/Location
      KOREA / 충청남도 당진시
    • Construction Overview
      <div><img alt="" src="/backoffice/images/editor/fad28866-c97b-4240-83d9-07a6712f2016190618_00000000.jpg" style="height:383px; width:600px" /></div>
  • 이미지
    Representative Project
    Karbala Refinery HRSG Turn-key project
    Division Client Construction period Country/Location Construction Overview
    HRSG Turn-key 현대건설(HDGSK JV) / SCOP 2015 Iraq / Karbala <div><img alt="" src="/backoffice/images/editor/6a3ac29d-6669-462e-86a3-281d5eee8fb4190618_00000000.jpg" style="height:383px; width:600px" /></div>
    • Division
      HRSG Turn-key
      Client
      현대건설(HDGSK JV) / SCOP
    • Construction period
      2015
      Country/Location
      Iraq / Karbala
    • Construction Overview
      <div><img alt="" src="/backoffice/images/editor/6a3ac29d-6669-462e-86a3-281d5eee8fb4190618_00000000.jpg" style="height:383px; width:600px" /></div>
Since established in 1999, We, GS Entec Energy Division has been carried out many projects and successfully delivered HRSGs to our client. We have a wide range of HRSG project management know-how and skilled professional manpower

In addition, we have the fabrication shop optimized for HRSG fabrication and the largest RT Bunker facility in Korea, and we have been able to comply with the recently strengthened Korean Nuclear Safety Law. We have been supplying high quality HRSG about 30 units per year and delivered it to our client on time so that we are continuing our reputation as the best HRSG provider in Korea.

Especially, In August 2015, We received a mega project to supply 16 HRSGs about USD 110 million from Siemens HTT (Formerly NEM), one of our main client and participated in the Egyptian public construction. We have been recognized in domestic and overseas for our superior competitiveness in HRSG fabrication and quality.

On the other hand, we entered into a Technical Service Agreement with Siemens HTT (Netherlands) in 2011 to reinforce our position as a HRSG turn-key supplier to provide design, Fabrication and perform guarantee based on accumulated HRSG fabrication capacity. Since then, we have been carrying out various sales activities both domestically and internationally, based on the project experiences.

Based on our accumulated performance and reputation in the combined cycle power generation market, we will actively respond to the needs of the market and our clients in the future. We will strengthen trust with our clients through delivery and quality management, We will also grow into a global top-tier supplier that focuses on strengthening our technological capabilities and enhancing our price competitiveness.

Service
  • Detail Engineering
  • Basic Design, Heat Balance, Efficiency & Stream Rate
  • Calculation – Flue Gas Calculation
  • Decision of Material & Specification
  • Fabrication & Manufacturing
  • Construction
  • Test & Commissioning
  • Training & Education
  • Supervision
  • Before / After Service
Product Line Up
  • HRSG (Heat Recovery Stream Generation)
  • Piping Spool & Fin Tube
  • Heavy Wall Cylindrical Equipment
  • HP.IP/LP Stream Drum